Cost guide · 150 kWp systems · Updated 12 May 2026

150 kWp commercial solar PV cost in the UK (2026)

At 2026 prices, a 150 kWp commercial solar PV system costs £120,000 - £148,500 installed (excl. VAT). Typical post-tax payback: 3.4-4.7 years.

Last reviewed 12 May 2026 3 min read By Cost guides

150 kWp cost summary

System size150 kWp
Installed cost (2026, excl. VAT)£120,000 - £148,500
£/Wp£0.80 - £0.99
Number of panels (450W)~330
Roof area required~840 m²
Annual generation (UK avg)142,500 kWh
Best fit forfactory, hotel chain, university hall, supermarket
Best grant stackFull Expensing + SEG + IETF candidacy (if energy-intensive) + regional grant £8k-£20k

Year-1 maths breakdown

Gross capex£134,250
Year-1 tax saving-£33,562
Net cost (Ltd, 25% CT)£100,688
Annual saving year 1£21,518 – £29,212
Gross capex (mid)£134,250
100% Full Expensing tax saving (25% CT)-£33,562
Net effective cost£100,688
Annual self-consumption (55%)78,375 kWh saving £19,594/year
Annual SEG export (45%)64,125 kWh earning £1,924 - £9,619/year
Total year-1 savings/revenue£21,518 - £29,212
Post-tax payback3.4 - 4.7 years
Donovan Fawcett · Director, SEO Dons Ltd Twelve years in UK commercial solar SEO and grant advisory. Editorial policy & independence.
FAQs

150 kWp commercial solar · FAQs

How much does a 150 kWp commercial solar system cost in 2026?

At 2026 prices, a 150 kWp commercial solar PV system costs approximately £120,000 - £148,500 installed (excl. VAT). After 100% Full Expensing tax relief for a limited company at the 25% main CT rate, net cost is around £90,000 - £111,375.

What is the payback period for a 150 kWp commercial solar system?

With 55% self-consumption and SEG export tariffs of 3p-15p/kWh, a 150 kWp system typically pays back in 3.4-4.7 years post-tax.

What size roof is needed for a 150 kWp system?

A 150 kWp system requires approximately 840 m² of unshaded roof area — around 330 450W panels.

How much electricity will a 150 kWp system generate?

A 150 kWp system generates approximately 142,500 kWh per year in UK conditions. Best fit for factory, hotel chain, university hall, supermarket.

Which grants apply to a 150 kWp system?

Best grant fit: Full Expensing + SEG + IETF candidacy (if energy-intensive) + regional grant £8k-£20k. Always use the eligibility calculator for a personalised match.

Get a sized quote for your 150 kWp project

Free 60-second eligibility check tells you exactly which grants and tax reliefs apply.

Free eligibility check See all system sizes
Call Eligibility check